CM AT RISK AND DESIGN-BUILD
Chapter 43.1 Requirements for Construction Management and Design-Build
-
- Chapter 43.1 Summary
- Local Governments - Chapter 43.1 Construction Management and Design-Build Contracts
- DGS Policy on Construction Management at Risk (pdf) (Word)
- DGS Policy on Design-Build (pdf) (Word)
DGS Review of Covered Institutions' CM and D/B Procedures
Per Section 2.2-4381 of the Code of Virginia, DGS reviews and makes recommendations for Covered Institutions' proposed Construction Management and Design-Build procedures. Forms for procedure review submittals are available on the DGS Forms Center:
DGS Construction Management / Design-Build Project Procurement Review
Per Section 2.2-4380 and 4381 of the Code of Virginia, DGS reviews and makes recommendations for proposed Construction Management and Design-Build project procurements. Forms for project submittals are available on the DGS Forms Center: